Friday, May 4, 2012

Week Five: In Overview

The goal for week five was to disassemble and redesign the SeaPerch. In addition to this, the group intended to gather the necessary materials for assembling the new design and by the end of the week hopefully test the design at the Drexel Pool (currently the group is waiting to hear back from the people in charge of running the pool.) If the team is unable to test the SeaPerch at the DAC, then the Perch will be tested on the Schuylkill River.

No comments:

Post a Comment